Jan and John Maggs Antiques

June 13, 2017 - July 5, 2017: Preparations for the foundation

____________________________________________________________________________

 

The last piece of old barn foundation

____________________________________________________________________________

 

Coming out - to be stored and re-used

____________________________________________________________________________

Part of our workshop - airborne until the new foundation is poured

____________________________________________________________________________

 

Removal of tons of clay

____________________________________________________________________________

 

The cellar hole takes shape

____________________________________________________________________________

Two six-inch diamtere pipes that will remove water from the site and give us a dry workshop in the basement 

____________________________________________________________________________

 

Many truckloads of fill will be trucked off to other construction sites - saving us the cost of removal

____________________________________________________________________________

 

One of six truckloads of stone that will stabilize the floor

____________________________________________________________________________

Another truckload of stone arrives

____________________________________________________________________________

 

The stone pile grows

____________________________________________________________________________

 

Ready to be spread as a base for the future basement floor

____________________________________________________________________________

A visit to the sawyer

____________________________________________________________________________

 

A few of the scores of large trees, harvested from Foxbard Farm in nearby Shelburne

____________________________________________________________________________

One of our trees - about to be sawn

____________________________________________________________________________

Sawyer David Lashway, preparing one of our twenty-foot posts

____________________________________________________________________________

 

The sawblade - bigger than it appears - capable of sawing the massive tree trunks

____________________________________________________________________________

 

The first five posts - each over 20 feet long

____________________________________________________________________________

 

Meanwhile, back in the hole

____________________________________________________________________________

 

Nick Potter levelling and compacting the stone

____________________________________________________________________________

The site - July 7th. We expect the footings to be poured in a few days.

____________________________________________________________________________

Click HERE for the next installment.

or

Click HERE for an index of this series.