Jan and John Maggs Antiques
June 13, 2017 - July 5, 2017: Preparations for the foundation
____________________________________________________________________________
The last piece of old barn foundation
____________________________________________________________________________
Coming out - to be stored and re-used
____________________________________________________________________________

Part of our workshop - airborne until the new foundation is poured
____________________________________________________________________________

Removal of tons of clay
____________________________________________________________________________

The cellar hole takes shape
____________________________________________________________________________

Two six-inch diamtere pipes that will remove water from the site and give us a dry workshop in the basement
____________________________________________________________________________

Many truckloads of fill will be trucked off to other construction sites - saving us the cost of removal
____________________________________________________________________________

One of six truckloads of stone that will stabilize the floor
____________________________________________________________________________

Another truckload of stone arrives
____________________________________________________________________________

The stone pile grows
____________________________________________________________________________

Ready to be spread as a base for the future basement floor
____________________________________________________________________________

A visit to the sawyer
____________________________________________________________________________
A few of the scores of large trees, harvested from Foxbard Farm in nearby Shelburne
____________________________________________________________________________

One of our trees - about to be sawn
____________________________________________________________________________

Sawyer David Lashway, preparing one of our twenty-foot posts
____________________________________________________________________________

The sawblade - bigger than it appears - capable of sawing the massive tree trunks
____________________________________________________________________________

The first five posts - each over 20 feet long
____________________________________________________________________________

Meanwhile, back in the hole
____________________________________________________________________________

Nick Potter levelling and compacting the stone
____________________________________________________________________________

The site - July 7th. We expect the footings to be poured in a few days.
____________________________________________________________________________
Click HERE for the next installment.
or
Click HERE for an index of this series.