August 15, 2017 - September 23, 2017: Erecting the frame
____________________________________________________________________________
The new foundation - ready to support the new timber frame
____________________________________________________________________________
Some of the commercial lumber that will be used to frame the deck and the roof
____________________________________________________________________________
Nick Potter, grading the front of the barn to make it accessible to the framing crew
____________________________________________________________________________
Jesse speaking with the operator who delivered the Douglas fir 2X12s that will support the roof
____________________________________________________________________________
The dimensional lumber piled in our front yard - no mowing for a while!
____________________________________________________________________________
Jesse overseeing the delivery of the first load of the massive timbers for the frame
____________________________________________________________________________
Jim McRae of Warwick Carpenters, laying out a new stairway to connect old and new buildings
____________________________________________________________________________
Jesse Brown shaping one of the timbers of the frame
____________________________________________________________________________
Four posts and six beams in the background, ready to be installed, and a section of sill being cut in the foreground
____________________________________________________________________________
One of the tenoned lap joints that will make the sills perfectly rigid sits on the foundation.
____________________________________________________________________________
The next timber joins the first.
____________________________________________________________________________
The north sill: three timbers joined to function as one
____________________________________________________________________________
Installing one of the beams that will support the first floor
____________________________________________________________________________
Nick Potter controlling the heavy lifting
____________________________________________________________________________
Tyler Slocum, Tim Slocum, and Liam McRae aligning and fitting two mortise-and-tenon joints
____________________________________________________________________________
The sills and floor beams are complete; many of the floor joists are installed.
____________________________________________________________________________
View from the basement
____________________________________________________________________________
A layer of plywood will serve as subfloor for the pine boards of the first floor -
____________________________________________________________________________
and as the ceiling of our basement workshop and storerooms.
____________________________________________________________________________
The crew: Tim, Jesse, Steve Slocum, Tyler, and Jim - enjoying the chocolate chip cookies that Jan baked as a reward for finishing the deck!
____________________________________________________________________________
The basement - under cover
____________________________________________________________________________
Dave Bernard and company, back to pour the floor under the lean-to
____________________________________________________________________________
We'll park our van here and use the remainder to store materials and yard machines
____________________________________________________________________________
Dave, creating the smooth finish of the new floor
____________________________________________________________________________
Nice!
____________________________________________________________________________
While Jesse continued to cut timbers, the Slocum team began making rafter trusses -
____________________________________________________________________________
assembling the seven-piece trusses one by one -
____________________________________________________________________________
and piling them next to the foundation, ready for the crane to lift them to the top of the frame.
____________________________________________________________________________
More timbers arriving from Jesse's New Salem shop
____________________________________________________________________________
Jesse's joinery is beautiful to behold; it's a shame that so much of it will be lost from sight once the frame is assembled.
____________________________________________________________________________
Most of the timbers are stored upside down, to keep water out of the mortises.
____________________________________________________________________________
Still more parts of this enormous woodworking enterprise
____________________________________________________________________________
The upper part of the frame will be held together by these king-sized 32-foot timbers.
____________________________________________________________________________
The crew used Jesse's tractor to gently carry the timbers to the deck -
____________________________________________________________________________
where they were then moved by hand -
____________________________________________________________________________
and then matched up, using the complex coding that Jesse applied to keep everything in order.
____________________________________________________________________________
Next, the individual timbers are assembled into "bents".
____________________________________________________________________________
The barn will be supported by four bents, each containing three twenty-foot posts and two fourteen-foot beams.
____________________________________________________________________________
The white oak floor joists for the second floor arrived on Saturday.
____________________________________________________________________________
This little pile of lumber weighed more than eight tons!
____________________________________________________________________________
On a misty Monday morning, September 18, our crane operator arrived at 9:00 a.m.
____________________________________________________________________________
The components had been assembled in advance,
____________________________________________________________________________
and final preparations were being made.
____________________________________________________________________________
The four posts at the rear of the lean-to were put in place and braced.
____________________________________________________________________________
Then, one by one, the three beams that frame the west wall of the lean-to were put in place.
____________________________________________________________________________
Jim shepherds the southwest tenon into its mortise,
____________________________________________________________________________
while Tyler does the same to the other end.
____________________________________________________________________________
The same procedure sets the rest of the west plate.
____________________________________________________________________________
Time to lift the first bent: Jesse orchestrates the delicate operation,
____________________________________________________________________________
while the remainder of the crew control the rise of the huge bent.
____________________________________________________________________________
When the first one was finally in place and upright, we all felt greatly relieved.
____________________________________________________________________________
The north bent rising
____________________________________________________________________________
The team made sure that the bent was controlled at every moment.
____________________________________________________________________________
This was our crane operator Doug's first raising, and he responded to instructions and the demands of the crew like a veteran.
____________________________________________________________________________
Finally the frame was ready to accept the 32-foor ties that would hold everything together under the weight of the roof.
____________________________________________________________________________
The first tie rises from the forks of the tractor
____________________________________________________________________________
and is moved to the waiting posts.
____________________________________________________________________________
Each of the four ties is installed.
____________________________________________________________________________
As the final tie rises to its place, we caught Jesse recording the moment in video.
____________________________________________________________________________
The final timber takes its place.
____________________________________________________________________________
Then, one by one, the thirty-five roof trusses are lifted into place,
____________________________________________________________________________
and braced temporarily. The roofers will connect them all with the horizontal nailers that will secure the wood shingles.
____________________________________________________________________________
Halfway through.
____________________________________________________________________________
All trusses are in place, awaiting final adjustment.
____________________________________________________________________________
Finally, the roof rafters over the lean-to are in place.
____________________________________________________________________________
The profile of our new barn
____________________________________________________________________________
Click HERE for the next installment.